Limited availability·Book a Consultation

Design and build a kitchen that works properly. Without managing the moving parts yourself.

For London homeowners who want more than a simple swap-out, we manage kitchen design, supply, installation, services coordination and finishing under one accountable team. Kitchen renovation projects typically start from around £20,000.

Projects from £20,000Design, supply & installInstallation-only also available
Book your kitchen consultation

Trusted by London homeowners

5-star rated service with verified review proof across Google, Houzz, and MyBuilder.

Google 5
My Builder 5
Best of Houzz Award
cover photos

5 star rated and award winning renovation company

better homes on googlebetter homes on houzzbetter homes on houzzbetter homes on mybuilderbetter homes on houzz

Quick Answer

A good kitchen renovation improves how the room performs, not just how it photographs

The strongest kitchen projects fix layout frustration, storage pressure, lighting, flow and finishing quality together, so the room becomes easier to use every day.

Direct answer: most London kitchen renovations sit between £12,000 and £60,000+, with many serious design-led projects starting from around £20,000. Installation is typically 3 to 6 weeks, but the right route depends on whether you are keeping the layout, redesigning the room, or combining the kitchen with wider structural change.

Conversion Tool

Want a fast kitchen budget range before you enquire?

Use the kitchen cost calculator to get a realistic starting range before you commit time to drawings, supplier visits or the wrong design direction.

Typical budget

£12,000 to £60,000+

Depends on kitchen size, cabinetry level, worktops, appliances and whether layout or structural changes are involved.

Installation phase

Typically 3 to 6 weeks

Straight installations move faster. Structural work, lead times and layout changes can extend the overall programme.

Starting point

From around £20,000

That is where many London kitchens start once you want a properly coordinated design, quality installation and a result that feels built to last.

Delivery model

Design-build or installation-only

We can manage the whole route or step in as the build team if your design and supply choices are already made.

Included

What is included in a kitchen renovation

This is the real work behind a finished kitchen. It is not just cabinets going in. It is coordination across services, layout, installation and finishing.

Strip-out and preparation

Removing the existing kitchen cleanly, preparing the room properly and dealing with the practical realities that affect the new install.

Plumbing and electrics

First-fix and service changes for new layouts, appliance positions, lighting, extraction and the day-to-day functionality of the room.

Units, worktops and cabinetry fitting

The core installation work that determines how the kitchen looks, feels and performs long after the handover.

Tiling, decorating and finishing

The surfaces, trims and final detailing that make the difference between a kitchen that is merely new and one that feels properly finished.

Appliance fitting and final connections

Integrating appliances cleanly and safely so the kitchen works as a complete room rather than a collection of separate parts.

Snagging and closeout

The final pass where tolerances, finishes and usability are checked so the result feels premium, not rushed over the line.

Costs

Kitchen renovation cost ranges in London

Use these guide ranges to narrow down which type of kitchen project is actually realistic for your budget before you fall in love with the wrong scheme.

£12,000 to £18,000Around 3 to 4 weeks

Basic refresh

Best when the layout broadly works and the goal is to replace tired cabinetry, surfaces and finishes without major reconfiguration.

£20,000 to £35,000Around 4 to 6 weeks

Mid-range redesign

The strongest fit for most London kitchens where you want a better layout, stronger storage, upgraded finishes and a more resolved design.

£35,000 to £60,000+Often 5 to 8+ weeks

High-end or structural kitchen project

Used when the project includes structural openings, premium cabinetry, higher-spec appliances, bespoke detailing or a more ambitious design brief.

Delivery Model

Design and build versus installation-only

Both routes can work. The right choice depends on how much is already resolved before site starts and how much coordination you want to own yourself.

Full design, supply and install

Best when you want one accountable team to coordinate the layout, technical planning, procurement input, installation and final finish. It reduces disconnects between what was drawn, what was ordered and what gets built.

Installation-only

Best when your kitchen has already been designed and sourced, but you still want an experienced team to install it properly, coordinate the trades and protect the finish quality on site.

Proof

Kitchen projects that show both finish quality and control

The best kitchen proof is specific. It should show that the room works better, the detailing is clean, and the installation did not unravel into stress.

High-spec kitchen renovation and installation in E3
Kitchen renovationE3, East London
Typical investment: £20,000 to £35,000Typical programme: 4 to 6 weeks

High-spec kitchen renovation and installation in E3

This project works as the lead proof block because it shows what serious kitchen clients care about: clean coordination, practical performance, finish quality and a process that feels controlled rather than chaotic.

The process was very smooth for a detailed kitchen project and the quality is excellent.
  • Layout optimisation and coordinated kitchen programme
  • Cabinetry, worktops, appliances and finishing delivered as one scope
  • Clear stage approvals to keep quality and expectations aligned

Lawrence, E3

Client testimonial

View case study
Modern kitchen renovation and installation in E4
Kitchen renovationE4, East London
Typical investment: £20,000 to £35,000Typical programme: 4 to 5 weeks

Modern kitchen renovation and installation in E4

The kitchen feels both beautiful and practical. The team delivered to a high standard and kept communication clear.

Alice, E4

Client testimonial

View
Kitchen renovation in E10
Kitchen renovationE10, East London
Typical investment: £18,000 to £30,000Typical programme: 3 to 5 weeks

Kitchen renovation in E10

The work was executed to a very high standard and the end result exceeded expectations.

Phil, E10

Client testimonial

View

Reviews

Kitchen-specific reviews, not generic praise

These are the kinds of comments that matter before you commit: timing, finish quality, practicality and whether the experience felt controlled.

Kitchen completed on time and to a high standard
I had our kitchen redone and couldn’t be happier! Celino’s team were amazing from start to finish. They worked so incredibly hard to get everything completed within time and at a high standard.

Alice Buchanan

Client review

Read
Detailed kitchen project handled smoothly
The process was very smooth for a detailed kitchen project and the quality is excellent.

Lawrence, E3

Houzz Review

Read
Beauty and practicality delivered together
The kitchen feels both beautiful and practical. The team delivered to a high standard and kept communication clear.

Alice, E4

Client review

Read

Process

How we keep kitchen projects organised

Kitchen projects usually become stressful when the design, supplier choices and installation are not properly coordinated. This process is designed to stop that happening.

Step 1

Define the right kitchen brief

We start by getting clear on how you cook, store, host and move through the room, so the design solves real frustrations rather than just changing the look.

Step 2

Plan the layout and technical scope

Cabinetry, appliances, electrics, plumbing, extraction, lighting and finishes all need to work together before installation starts.

Step 3

Prepare the room properly

Strip-out, making-good and first-fix work come before the visual transformation. This is what protects the quality of the install later.

Step 4

Install with controlled sequencing

Units, worktops, appliances, tiling and decorating are sequenced carefully so tolerances stay tight and the finish quality does not drift.

Step 5

Snag and hand over properly

A kitchen should be handed over feeling complete, aligned and ready to use, not waiting on a tail of small fixes.

Guarantees that protect the work after handover

When you invest heavily in your home, you should know what happens after the builders leave. Our workmanship guarantees are there to give you clear protection and peace of mind.

  • 10 years

    Extension and loft conversion guarantee

  • 2 years

    Bathroom fitting and renovation guarantee

  • 2 years

    Kitchen fitting and renovation guarantee

  • 1 year

    Painting and decorating guarantee

Want the full guarantee breakdown?

Read it here

FAQ

Frequently Asked Questions

  • Most London kitchen renovations sit between roughly £12,000 and £60,000+, depending on the size of the room, cabinetry level, worktops, appliances and whether layout or structural changes are involved. Many serious kitchen projects start from around £20,000.
  • A full kitchen renovation usually includes strip-out, plumbing and electrics, cabinetry installation, worktops, tiling, appliance fitting, decorating and final snagging. Some projects also include layout changes or structural opening works where needed.
  • Most kitchen installations take around 3 to 6 weeks on site. Straight replacements can be quicker, while structural work, supplier lead times and wider layout changes can extend the overall programme.
  • Yes. We can manage the full design, supply and install route, or step in as the installation team if your kitchen has already been designed and sourced.
  • Yes. We can deliver structural modifications where required, including layout opening, service coordination and the integration work needed when a kitchen project is part of a bigger change to the home.

Useful Reading

The kitchen guides worth reading before you commit

If you are still comparing suppliers, budgets or whether the project may grow into wider renovation work, start here.

Kitchen renovation guide for London homeowners

The broad guide to layouts, budgets, material choices and planning a kitchen that works beyond the moodboard stage.

Kitchen providers comparison guide

Useful if you are comparing suppliers and want a clearer sense of what changes between design-led and price-led kitchen routes.

Home renovation cost guide

Helpful if your kitchen project may expand into wider refurbishment, service upgrades or layout changes elsewhere in the home.

Next Step

If the kitchen is the room that keeps frustrating you, start with a realistic conversation

A useful first conversation should tell you what kind of kitchen project makes sense for the room, what budget band is realistic, and whether a simple installation or a more coordinated design-build route is the better fit.

Where We Work

Serving London's finest areas with exceptional home renovations

Better Homes proudly serves homeowners across London's most prestigious and vibrant areas. From the leafy suburbs of North East London to the bustling heart of Central London, our expert team brings exceptional craftsmanship and innovative design to every renovation project.

Whether you're looking to transform your bathroom, renovate your kitchen, or undertake a complete home renovation, we're here to bring your vision to life with our signature blend of quality, reliability, and attention to detail.

For the right project - contact us wherever you are

Get Your Free Quote